RM STRUCTURAL
SNAGGING INSPECTIONS

New-build snagging by a structural engineer — not a checklist.

Most snagging inspectors spot paint runs and sticking doors. A structural engineer also spots settlement cracks, movement and poor build quality — the defects that actually cost money later. We inspect new-builds across London, Ipswich, Colchester, Norwich, Cambridge and Birmingham, with a full photo report within 48 hours.

Book an inspection Why an engineer?
THE ENGINEER ADVANTAGE

The difference between a snag list and a structural opinion.

TYPICAL SNAGGING INSPECTOR
· Cosmetic finish — paint, sealant, scratches · Doors, windows and fittings operation · Visual tidiness of plumbing and electrics · Standard checklist, no engineering judgement · Can't tell a shrinkage crack from movement
RM STRUCTURAL-LED INSPECTION
  Everything on the cosmetic list — and then the structure   Settlement and movement cracks assessed, not just logged   Build quality judged against Building Regs & NHBC standards   Roof structure, lintels, DPC and drainage checked with an engineer's eye   Defects prioritised by severity, so you know what to push the developer on
WHAT WE INSPECT

Top to bottom, inside and out.

Structure & movement

Cracking assessed and classified, floors checked for level, walls for plumb — with an engineering judgement on cause and severity.

External envelope

Brickwork, pointing, DPC, weep holes, render and cladding — checked against good practice and warranty standards.

Roof & loft space

Roof structure, felt, insulation, ventilation and visible workmanship inside the loft.

Internal finishes

The full cosmetic snag list: walls, ceilings, joinery, doors, windows, sealant, flooring and decoration.

Services (visual)

Visible plumbing, heating and electrical installations checked for workmanship and obvious defects.

Externals & drainage

Driveways, paths, garden levels, fencing, garage and surface-water drainage.

YOUR REPORT

A report your developer has to take seriously.

Every defect photographed — numbered, located and described so nothing is disputed.
Severity ratings — structural concerns separated from cosmetic snags, so priorities are clear.
Standards referenced — defects tied to Building Regulations and NHBC tolerances where relevant.
Developer-ready format — a professional document you can send straight to the site manager.
Engineer follow-up — questions after you've read it? Your engineer is on the phone, included.
Delivered within 48 hours of inspection.
Book yours
Structural engineer inspecting a new-build property during a snagging inspection
WHO IT'S FOR & WHEN

Buying a new-build? The timing matters.

BEST

Before legal completion

Maximum leverage — the developer fixes defects before you move in, on their programme, not yours.

GOOD

Shortly after moving in

Developers typically remain responsible for defects reported in the first two years. A documented report keeps them accountable.

STILL WORTH IT

Before warranty milestones

Approaching the end of your two-year builder warranty? An engineer-led inspection catches what you'll otherwise pay to fix.

Tell us about your project.
Get a same-day quote.

No obligation, no jargon — just a clear fixed fee and an honest view of what your project needs.

Request a Quote Call 07425 298816